White Papers Project Summary's and Project Images

 

Search
Frist Climate Project Summary Wind Power in the Region of Marmara for offset of CarbonTradeEx America 2009
Thumbnail

The project activity consists of the installation of a wind park with a total capacity of 60
MW in order to supply renewable energy to the grid. This clean energy will displace
electricity generated from conventional thermal power stations based on fossil fuels,
thereby reducing GHG emissions.

  • Project type: Renewable energy, wind
  • Type of certificate: VER
  • Quality standard: The project is a registered VER Gold Standard activity.


File size 289 K
Downloads 16
Date Fri 10/09/2009 @ 09:06
Author Darrin Stern
EMail d.stern@koelnmessenafta.com
DOWNLOAD

PRE-2012 CDM REFORM
Thumbnail

The full paper on the pre-2012 CDM reforms that must be directed by the CMP at COP15

 



File size 356 K
Downloads 18
Date Fri 10/09/2009 @ 08:56
Author Alexandra Galin
EMail alexandra.galin@cmia.net
DOWNLOAD

< BACK  1 of 1  NEXT >

 

Copyright 2010 by Carbon TradeEx   Contact Us | Site Map | Disclaimer | Login |
Website Maintained by Evolution Point, LLC.


Website maintained by Evolution Point - chicago marketing agency, web development chicago, chicago web development, print design, integrated marketing services chicago, interactive agency, search engine optimization, multilanguage website